+382 67010555

Facade construction of an apartment building in Budva

Facade construction of an apartment building in Budva

City: Budva
Housing type: Apartment building
Work period: 2020

The specialists of our company performed the following works:

  • Surface preparation – installation of drainage systems, surface cleaning. A mandatory nuance of the preparatory work is the completion of all roofing, glazing and carpentry work.
  • Puttying – preliminary leveling of walls using a special facade putty mixture for water-dispersion materials.
  • Priming – increasing adhesion with dyes by reducing the porosity of the surface and its moisture absorption.
  • Coloring – improvement of decorative properties, as well as weather resistance, mechanical strength.

In facade works, high-quality materials were used with an emphasis on the specifics of the local climate.

100+
Completed Projects
18
Years of Construction in Montenegro
80+
Happy Customers

Contact Us

Complete the form and an Adriatic Point
specialist will contact you within 15 minutes