Capital construction of the object “The Cube”. Tivat, Krasici

Capital construction of the object “The Cube”. Tivat, Krasici

City: Tivat
Housing type: Apartments and villas
Work period: 2022-2025

Our specialists have completed the following works:

  • Site clearing and preparation for construction
  • Installation of underground utilities
  • Excavation of the foundation pit and pouring of the foundation
  • Erection of the building frame
  • Roof waterproofing
  • Preparation of the ground floor facade for decorative stone cladding
  • Natural stone masonry on retaining walls
  • Electrical wiring installation throughout the site
  • Installation of facade glazing
  • Installation of galvanized metal facade structures

Interior finishing works:

  • Installation of utilities — water supply and electrical systems
  • Installation of windows and doors
  • Installation of embedded components for the air treatment system
  • Plastering and floor screeding
  • Drywall installation in Villa 2
  • Ceramic tile laying in Villa 2
  • Painting works in Villa 2
  • Pool tiling in Villa 2

The quality of construction and finishing works meets European standards.

We use materials and technologies from leading industry manufacturers, and take into account the specific features of the Montenegrin climate when equipping buildings and ensuring compliance with technological standards.

100+
Completed Projects
18
Years of Construction in Montenegro
80+
Happy Customers

Contact Us

Complete the form and an Adriatic Point
specialist will contact you within 15 minutes