Completion of the capital phase of construction work at the Prime residence complex.
![](http://adriaticpoint.me/wp-content/uploads/2024/03/dji_0876-1024x576.jpg)
Start of construction of a new facility in the Bigova village
![](http://adriaticpoint.me/wp-content/uploads/2024/04/dji_0633-1024x576.jpg)
Start of construction of an apartment building in Tivat
![](http://adriaticpoint.me/wp-content/uploads/2024/02/unnamed-1024x576.jpg)
Start of construction of a new building
![](http://adriaticpoint.me/wp-content/uploads/2023/12/dji_0975-1024x576.jpg)
Start of finishing work on the complex The Cube, Krasici
![](http://adriaticpoint.me/wp-content/uploads/2023/11/2-1024x576.jpg)
Purchase of land in Montenegro
![](http://adriaticpoint.me/wp-content/uploads/2023/03/image-1024x576.jpg)
Montenegro is a young country of the Balkan Peninsula, which declared its independence in 2006 after the collapse of Yugoslavia. Despite the “young age”, Montenegro (the name of Montenegro in Italian) has something to brag about. There are unique nature reserves here, some of which are included in the UNESCO list, there is access to […]
Completion of a guest house floor
![](http://adriaticpoint.me/wp-content/uploads/2023/03/image2-1024x576.jpg)
Pouring the concrete bowl of the pool
![](http://adriaticpoint.me/wp-content/uploads/2023/01/11-—-kopiya-min-1024x683.jpg)
Tivat, Krasici. “The Cube” complex.
Finishing work on a turnkey basis for an apartment with 2 bedrooms in Tivat
![](http://adriaticpoint.me/wp-content/uploads/2022/11/1-1024x768.jpg)
What have we implemented in this project?Development of a design project, complex equipment with furniture and appliances– Replacement of flooring, skirting boards in all rooms;– Transfer of switches, sockets and connection points for plumbing fixtures;– Complete replacement of ceramic tiles and plumbing in bathrooms with installation of underfloor heating;– Arrangement of a dressing room at […]
Continued construction of the elite residential complex “THE CUBE”, Krasici
![](http://adriaticpoint.me/wp-content/uploads/2022/11/dji_0734-1024x576.jpg)
The phase of rough construction works at the object “Cube” in the village of Krasici, Tivat.In complex: